Skip to content
Energy

Romanian Environmental Fund Administration launches 400 million lei renewable energy storage subsidy program

News Romania Editorial team · AI-written, reviewed under our editorial standards · · Reading time 7min read · Views 0 ·
Key — The Romanian Environmental Fund Administration has launched a 400 million lei subsidy program for renewable energy storage systems. The program offers non-reimbursable funding covering up to 75% of project costs for eligible beneficiaries.

The Romanian Environmental Fund Administration launched a subsidy program for renewable energy storage systems on November 16, 2026. The administration allocated a total budget of 400 million lei to fund the energy storage installation program. This initiative aims to increase the efficiency of renewable energy use by allowing prosumers to store excess energy produced by photovoltaic panels.

The registration phase for installers began on November 16, 2026. As of November 17, 2026, 376 companies had registered for the program. Individual prosumers can register for the program starting at 10:00 on November 20, 2026, until 23:59 on November 25, 2026.

Subsidy details and limits

The program provides non-reimbursable funding that covers up to 75% of the total value of a project. This subsidy is capped at 15,000 lei, including VAT. The maximum eligible cost for the program is set at 1,500 lei per kilowatt-hour (kWh) of installed storage capacity, including VAT.

Minister of Environment, Waters and Forests Natalia Intotero said the program supports prosumers in storing unused energy for later use to reduce grid purchases. Natalia Intotero also stated that the selection process is based on project characteristics rather than application speed.

Scoring and selection criteria

Beneficiaries are selected using a scoring system with a maximum of 100 points. This system ensures that selection is based on specific project characteristics instead of the order in which applications are submitted. The scoring system includes several specific components to evaluate applicants.

The evaluation includes up to 40 points for storage capacity. To achieve the maximum 40 points for capacity, a system must have at least 15 kWh of capacity. This represents a reduction from the previous requirement of 20 kWh. The scoring system also allocates up to 35 points for the applicant's own contribution. The remaining 25 points are awarded for the absence of previous non-reimbursable storage funding.

The program seeks to optimize the integration of renewable energy into the national grid by incentivizing the installation of storage technology. By allowing prosumers to capture and store surplus electricity, the administration intends to stabilize energy distribution and reduce reliance on external grid purchases during peak demand periods.

Glossary

  • lei — The lei is a unit of currency used for denominations of paper money. It has been issued by various entities including the Banca Națională a României and the Ministry of Finance.
  • VAT — VAT is a tax that tourists are expected to pay on goods and services. Some countries may provide a reduction in this tax for specific tourist-related services.
  • prosumers — A prosumer is an individual who both consumes and produces. In the field of renewable energy, these are households or organisations that produce surplus energy to feed into a distribution network or consume energy from the grid.
  • photovoltaic panels — Photovoltaic solar panels are active solar devices that help provide sustainable electricity for any use. They collect energy, often through installation on roofs, to generate electricity.

This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact

How did you like this post?

Comments 0

Be the first to comment

Contact us

← News Romania Home
News Romania Get new posts by emailSubscribe to receive new content via email. Unsubscribe anytime.
Was this helpful?Share it with friends & social