Chlorine Leak at Chimcomplex Platform Causes Evacuations in Râmnicu Vâlcea
Military firefighters were requested to intervene on November 13, 2026, following reports of a chlorine leak originating from a compressor on the Chimcomplex platform located in Râmnicu Vâlcea. To safeguard the local population, a warning message was disseminated through the RO-Alert system to all nearby residents. Police established traffic restrictions on access roads and surrounding sectors to prevent public exposure and facilitate the movement of specialized emergency response units. The Emergency Situations Committee activated at 8:00 a.m., deciding on a heightened level of caution due to atmospheric fog hindering vapor dispersion.
Incident Details and Timeline
The company Chimcompex reported that the incident occurred at 7:49 a.m. This event triggered a chain reaction, causing the subsequent shutdown of other installations and resulting in the accidental atmospheric evacuation of approximately 15.5 kg of chlorine. Emergency response services were alerted at 8:05 a.m., with ambulance and fire crews arriving on site by 8:20 a.m. The company confirmed that all controlled shutdown procedures were successfully completed.
Five employees were identified as experiencing respiratory issues, including irritation and coughing, and were subsequently transported to the hospital. The company stated that all active employees on the platform during that shift received immediate first aid. Furthermore, rapid intervention teams ensured the evacuation of all personnel present on the platform by 8:35 a.m., adhering strictly to standard operating procedures. The police confirmed that the initial call to 112 around 8:00 a.m. concerned chlorine leaks at the membrane electrolysis installation.
Stakeholder Responses and Context
The company Chimcomplex Borzești announced that the industrial platform in Râmnicu Vâlcea was completely shut down on the morning of November 13, 2026, following the chlorine incident. This shutdown followed the accidental compressor failure, which led to the release of about 15.5 kg of chlorine and the minor intoxication of five staff members. The Emergency Situations Committee subsequently activated the yellow code plan at 8:00 a.m. because the fog conditions prevented the vapors from dispersing quickly into the upper atmosphere.
Authorities confirmed that the toxic substance reached outside the chemical platform, and CBRN teams conducted measurements between 2 and 4 kilometers from the facility, recording zero values. Police officers remained in the affected zones to inform traffic participants and local residents about the implemented restrictions while supporting other involved emergency structures. The military firefighters were specifically requested to manage the chlorine leaks detected at the compressor level.
The Vâlcea County Emergency Hospital received three patients, a 42-year-old woman and two men aged 45 and 30, who required medical attention. One of the individuals was found in a state of semiconsciousness following the exposure. The company stated that the three victims transported to the hospital were conscious and outside any immediate danger. The police have officially registered the incident following the 112 call.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0